How to deal with wood floor soaking water and minimize damage?

Laying wooden floors in the home and accidentally being soaked in water can cause many sequelae. What should we do with the sudden water soaking event on the wooden floor to minimize damage to the wooden floor?

u=153077955,2931062040&fm=11&gp=0.jpg

Restaurant wooden floor

Option 1: Use a high-power vacuum cleaner to suck

Adaptation to the disease: solid wood flooring with a small area of ​​water in a straight-through manner

Treatment plan: If the water inflow phenomenon is found in a very short time, a high-power vacuum cleaner can be used to suck out the water vapor. However, if a large area of ​​water is poured, the floor should be lifted up and dried in the second way.

At the same time, if the indoor moisture is large, if there is a condition that the dehumidifier can be installed indoors, the indoor moisture can be drained in a short time, but this operation scheme needs to have the floor dry recognition technology.

Option 2: Remove the baseboard

Applicable conditions: strengthen the floor soaking water

Treatment plan: Whether it is a large area of ​​water or a small area of ​​water, it is not recommended to lift the laminate floor to dry, so it is easy to damage the laminate floor, it may cause serious consequences that can not be reused.

It is best to quickly drain the surface water of the floor, then remove the baseboard of the floor, reveal the expansion joints, and distribute the water vapor by the expansion joints. However, depending on the amount of water inflow, it usually takes about seven to fifteen days for drying. Products that are better or have not been soaked for a long time can recover on their own. If they cannot recover after fifteen days, they should be considered for replacement.

1472788856338918.jpg

Bedroom wooden floor

Option 3: Pick up the wooden floor and put it in a "well" shape.

Applicable conditions: the floor that was picked up after soaking in water

Treatment plan: For the soaking floor, it is important to dry it as much as possible to keep the floor from deforming. After the surface water of the floor is wiped dry, it is placed in a “well” shape, and the weight generated by the lamination is used to prevent the occurrence of deformation. When placing the surface, pay attention to the reverse side of the floor to prevent the surface from being caused by rapid drying. Dry cracking, while paying attention to the sun can not be exposed to the sun, it should be placed in a ventilated place dry, in general, for better quality solid wood and multi-layer solid wood can be used again.

In addition, in the event of water leakage, the floor after-sales service should be notified at the first time, and the staff will provide the best solution to the owner in combination with the floor's own situation.

Option 4: One side leaks, both sides are ventilated

Adapt to the disease: add keel, a small area of ​​water-immersed solid wood flooring

Treatment plan: a small area of ​​water found in time, after the ground is cleaned, the board is picked up, the wet floor is dried and re-installed; if the water intake is slightly larger, not only the board at the leak is picked up, but also The opposite board should also be picked up in the direction of the keel arrangement to allow the internal air to carry away the moisture. If you can't determine the amount of water inflow, it's best to pick up the board in turn according to the flow direction of the influent water, and check the moisture condition.

If it is not treated after soaking in water, or improperly handled, it will not dry properly, and the wooden floor may also cause mold and even cracking. Therefore, the wooden floor should be treated as soon as possible after soaking in water.

Floor pull-up Projector screen

Floor Pull-Up Projector Screen,Desktop Projector Screen,Floor Rising Projector Screen,Portable Projector Screen

Dongguan Aoxing Audio Visual Equipment CO.,Ltd , https://www.aoxing-projectorscreen.com